The closure process should be done by filling the remaining spaces after tank puts to excavation area. In addition, this process should not be provided on one side. Filling should be done at equal distances and amount from four sides. When sand is unloaded from one side, your tank may slide towards the other side and it can be deformed by hitting the floor.