5 ton septic tank products will be sufficient for monthly discharge periods for using 7 up to 10 people. You can provide product discharges through sewage trucks.
For the areas away from the sewer line (where the flowability cannot be sufficient), filling into the tank can be achieved by transferring to the sewer line through the pumps. For this type of use, you can request of the arrangement of product equipment, according to the pump system. The septic tanks are generally produced as horizontal position. The reason for this, to minimized the depth of the excavation by minimizing the height measurement. It can also be produced vertically on request.

5 Ton Septic Tank Price

5 Ton Septic Tank Price

Product Price

94000$
  • Our prices do not include VAT.
The price is for standart production. The price may vary for alternative sizes.

5 Ton Septic Tank Installation

For installation of 5 ton septic tank, please display the embedding instructions and install according to these instructions. Do not cover the tank with excavation soil.


INSTRUCTIONS




Standard Dimension

Width 180 cm
Length 200 cm
Height 220 cm
Elevation Level 30 cm

Equipment List

Vent Pipe dn50
Inlet dn150
Manhole dn462
Lifting Lugs 2 pcs.


Alternative Dimension

Width 140 cm
Length 320 cm
Height 175 cm
Elevation Level 30 cm

Equipment List

Vent Pipe dn50
Inlet dn150
Manhole dn462
Lifting Lugs 2 pcs.
For alternative dimensions, the instructions in the order process will be sent to you. You can call us for more alternative sizes and information.CONTACT

You must follow the instructions that are sent to you, during the installation of the tank. We also recommend that you review the instructions below. The instructions that are clarified on technical drawing are your warranty terms.

  • The dimensions of the excavation area where the tank is to be placed are clearly stated in the instructions. These measures should not be exceeded.
  • The ground of the area where the tank is to be placed must be a flat concrete.
  • Do not use excavation soil when cover the tank. Also, remove the excavated soil from around of excavated the area. With the any possible strong rain, the excavation soil can drop over tank and damage the product.
  • Provide the placement of the tank at the center of the excavation area. Equal distance is required from all sides.
  • When closing over of the tank, fill the sand with equal amount to all sides.
  • Tank should be covered with thin sand. Do not cover the tank with excavation soil.
  • Provide tank placement with lifters that on the tank.
  • Take care to have a warning sign around the tank and keep the manhole cover closed.
  • The tank vent pipe will allow the air pressure to be take out during the discharged of tank by sewage truck. In particular, keep the vent pipe opening during discharging of tank.
  • Take care not to drop or crash when placing the tank in the excavation area.